T-012-017 Integration test review
Description of integration test plan
Provide a description of the integration test plan or reference the specific document (e.g. R-TF-012-006 LIfecycle plan and report
) where the integration test plan is detailed.
Provide the description of the integration test to be executed, e.g. Integration Test for ASCORAD Processor
.
Evaluation of integration test plan adequacy
- The integration test plan covers all critical components
- The test environment is well defined
- The steps to execute the test are well defined
- Roles (author of the test, tester) are well defined
- Expected results are well defined
Provide any comments about the adequacy of the integration test plan
Evaluation of integration test results
Test execution and test results:
- All planned tests wee executed
- Test results met the predefined acceptance criteria
- All anomalies and issues were documented and addressed
Provide any comments about the integration test results
Signature meaning
The signatures for the approval process of this document can be found in the verified commits at the repository for the QMS. As a reference, the team members who are expected to participate in this document and their roles in the approval process, as defined in Annex I Responsibility Matrix
of the GP-001
, are:
- Author: Team members involved
- Reviewer: JD-003, JD-004
- Approver: JD-001
Delete this section when you create a new record from this template.
Signature meaning
The signatures for the approval process of this document can be found in the verified commits at the repository for the QMS. As a reference, the team members who are expected to participate in this document and their roles in the approval process, as defined in Annex I Responsibility Matrix
of the GP-001
, are:
- Author: Team members involved
- Reviewer: JD-003, JD-004
- Approver: JD-001