T-012-018 Test plan
Description
Insert a brief description of the test to be executed.
Requirements
Insert the requirements covered by the test plan.
Risk control for
Insert the hazard(s) ID and description associated with the requirements covered by the test and that are going to be addressed by executing the test.
Minimum equipment
Insert the specifications for the equipment to be used for the test execution (hardware and software).
Preconditions
Describe any preconditions required prior to the test execution.
Input data
Insert the input data for the test execution.
Steps
List and describe the steps to be followed during the test execution.
Expected outcome
Insert the expected results of the test and acceptance criteria.
Signature meaning
The signatures for the approval process of this document can be found in the verified commits at the repository for the QMS. As a reference, the team members who are expected to participate in this document and their roles in the approval process, as defined in Annex I Responsibility Matrix
of the GP-001
, are:
- Tester: JD-017, JD-009, JD-004
- Approver: JD-005